The Next Edition
  • Home
  • About Us
  • News
  • Featured
  • Investigations
  • Foreign
  • Special Reports
  • Entertainment
  • Interviews
  • Advert Rate
No Result
View All Result
The Next Edition
No Result
View All Result
  • Home
  • About Us
  • News
  • Featured
  • Investigations
  • Foreign
  • Special Reports
  • Entertainment
  • Interviews
  • Advert Rate
Home Top News

GenCos Failed To Generate 2,352.5 Megawatts Due To Unavailability Of Distribution Infrastructure

Next Edition by Next Edition
October 18, 2019
in Top News
GenCos Failed To Generate 2,352.5 Megawatts Due To Unavailability Of Distribution Infrastructure
0
SHARES
1
VIEWS
Share on FacebookShare on TwitterShare on Whatsapp

Electricity Generation Companies (GenCos), comprising gas-fired and hydro stations said that they could not generate 2,352.5 megawatts of electricity on Wednesday due to unavailability of distribution infrastructure.

This is contained in a daily energy report by the Advisory Power Team, office of the Vice President, a copy of which was obtained by News Agency of Nigeria, NAN, in Abuja on Thursday.

You might also like

Medical Doctor, 2 Others Remanded For Alleged Child Theft In Anambra

Police Re-Arrest Enenche Enenche In Abuja Amid Trial For Alleged Cyberstalking Of Dunamis Pastor Paul Enenche

Senate Begins Public Hearing On Constitution Review In Lagos

The report also attributed the 2,352 .5 megawatts not generated to high frequency.

It also noted that 1.55 megawatts of electricity was not generated due to unavailability of transmission infrastructure during the period.

READ ALSO: We Will Solve Electricity Distribution Problems – Discos

Similarly, it said that 1,551 megawatts was not generated due to unavailability of gas.

The report, however, said that the GenCos released an average of 3,500 MegaWatts-Hour of electricity into the national grid.

It said that the electricity sent out by the GenCos was up by 98.87 megawatts from the 3,401 released on Tuesday.

The report said zero megawatts was recorded as losses due to water management procedures.

The report revealed that the power sector lost an estimated over N1.94 billion due to insufficient gas supply, distribution and transmission infrastructure.

On sector reform/activities, it said that the dominant constraint for Wednesday was high frequency resulting from unavailability of distribution infrastructure.

The report said that the peak generation attained on Monday was 4, 140 megawatts.

NAN

Tags: Electricity Generation CompaniesinfrastructureMegawattNIgeriawater management procedures
Next Edition

Next Edition

Recommended For You

Kaduna Govt Charges ‘Fake’ Doctor Who Worked For 11 Years To Court

Medical Doctor, 2 Others Remanded For Alleged Child Theft In Anambra

  The Anambra State Children, Sexual and Gender-based Violence Offences Court sitting in Awka has remanded a 72-year-old doctor and two women for allegedly stealing and selling a...

Police Re-Arrest Enenche Enenche In Abuja Amid Trial For Alleged Cyberstalking Of Dunamis Pastor Paul Enenche

Police Re-Arrest Enenche Enenche In Abuja Amid Trial For Alleged Cyberstalking Of Dunamis Pastor Paul Enenche

  The Nigerian police have arrested Obonyilo Peter Enenche, popularly known as 'Enenche Enenche', in Abuja. He was last seen on Thursday at the birthday celebration of Senator...

Senate Investigates Killing Of 16 Nigerian Army Personnel In Delta

Senate Begins Public Hearing On Constitution Review In Lagos

  The Senate has officially commenced its much-anticipated public hearing on the comprehensive review of the 1999 Constitution, aiming to address critical reforms that could reshape the country’s...

Alt="Independent National Electoral Commission (INEC) Logo"

INEC Receives 12 Additional Party Registration Requests

  Mahmood Yakubu, INEC chairman facebook sharing buttontwitter sharing buttonemail sharing buttonsharethis sharing buttonwhatsapp sharing button The Independent National Electoral Commission (INEC) says it has received 12 additional...

Next Post
Minimum Wage: Labour, FG Finally Reach Agreement On Percentage Increase

Minimum Wage: Labour, FG Finally Reach Agreement On Percentage Increase




Related News

FG strengthens fight against tuberculosis

FG strengthens fight against tuberculosis

JUST IN : Senate Probes Senator Abbo Over Assault

JUST IN : Senate Probes Senator Abbo Over Assault

Diversification Agenda and Emergence of A Resilient Economy

Diversification Agenda and Emergence of A Resilient Economy




The Next Edition

Office Address

3B, Agboola Aina street, Off Toyin Street,
Ikeja, Lagos.

Quick Contact Details

Phone:
08033018430
Whatsapp:
08051679910

Email:
[email protected]
[email protected]

Categories

  • Aviation
  • Beauty
  • Breaking News
  • Business
  • Columnists
  • Editorial
  • Entertainment
  • Fashion
  • Featured
  • Football
  • Foreign
  • Headline News
  • Home & Garden
  • Interviews
  • Investigations
  • North Central
  • North East
  • North West
  • Opinion
  • Parenting
  • Politics
  • Relationships
  • South East
  • South West
  • South-South
  • Special Reports
  • Sports
  • Top News
  • Vox Pops

© Next Edition Business Development Limited

  • About Us
  • Advert Rate
  • Contact Us
  • Privacy Policy
  • Terms of Use
No Result
View All Result
  • Home
  • About Us
  • News
  • Featured
  • Investigations
  • Foreign
  • Special Reports
  • Entertainment
  • Interviews
  • Advert Rate

© Next Edition Business Development Limited