Lagos State Government said it will close down Adejobi Street, Agege, Adegbola Level Crossing and Works Road for three days from Monday for the ongoing Lagos-Ibadan standard gauge railway project.
The roads will be closed on the 9th, 11th and 12th of Nov. 2020 from 8p.m. to 7a.m. on each date, according to a statement by the Lagos State Ministry of Transportation.
READ ALSO: Rivers Varsity Rescinds Suspension Of Two Students
It therefore advised motorists to use alternative routes that had been provided during the construction works to enhance free flow of traffic on the said dates.
According to the statement, motorists plying Adejobi, Agege axis would be diverted to Fagba Crossing, Toyin Crossing and Ashade Underpass to access their desired destinations.
Those wishing to access Adegbola Street or other areas from Adegbola are advised to make use of Works road, Oba Akinjobi Way to Ikeja Underbridge, Ashade Underpass, Airport Underbridge, Ikeja Along, and Local Government Secretariat Way to get to their desired destinations.
The state government implored motorists to comply with the Traffic directions put in place to minimize inconveniences in movement, adding that the closure was necessary to ensure smooth and uninterrupted flow of work on the rail tracks.
It also appealed to residents, especially motorists that ply the affected routes to bear the pains, as the project was aimed at achieving a seamless multi modal transport system that would meet the transportation needs of a larger population.