The Next Edition
  • Home
  • About Us
  • News
  • Featured
  • Investigations
  • Foreign
  • Special Reports
  • Entertainment
  • Interviews
  • Advert Rate
No Result
View All Result
The Next Edition
No Result
View All Result
  • Home
  • About Us
  • News
  • Featured
  • Investigations
  • Foreign
  • Special Reports
  • Entertainment
  • Interviews
  • Advert Rate
Home Headline News

700MW Zungeru Power Project: FG Explains New RCC Technology

Simple Ikem by Simple Ikem
March 19, 2019
in Headline News
700MW Zungeru Power Project: FG Explains New RCC Technology
0
SHARES
13
VIEWS
Share on FacebookShare on TwitterShare on Whatsapp

The Federal Government at the weekend explained reason behind the introduction of entirely new technology, the Roller Compacted Concrete (RCC) technology, in the construction of the 700 Megawatts Zungeru Hydro Power Dam, in Niger State.

Abubakar Dangaladima, Director, General Services, Federal Ministry of Power, Works and Housing, gave insight into the benefits of the new technology during a monitoring, evaluation and inspection visit by a team from the Ministry of Power, Works and Housing led by the power arm of the ministry.

You might also like

FG Disbursed N316bn To National Assembly In Two Years As Spending Doubles

Man Remanded For Impregnating 15-Year-old Girl In Lagos

US Court Jails Five Nigerians For 159 Years

Dangaladima, said most dams in the country are either rock or concrete, but the Zungeru Dam is being developed using linear type of concrete technology, known as RCC technology, to ensure that construction works are going on at any period of the year.

READ ALSO: Presidential Poll: Declare Me Winner or Cancel Poll, Atiku Asks Tribunal, Lines Up 400 Witnesses

“The technology being used to develop the dam is new in Nigeria. Currently most dams we have in the country are either rock or concrete, but in this project we are utilising what is called linear type of concrete technology, known as Roller Compacted Concrete RCC technology.

“Using RCC technology has helped to ensure that construction works are going on at any period of the year. It also reduces the construction size of the dam project,” he said.

He added that normally most dams are built underground, but in the case of Zungeru Dam, it is built over ground, stressing that the contractors had done a lot to provide training for Nigerian Engineers who are engaged in the works.

Dangaladima noted that the training became necessary to enable Nigerian Engineers cope with the new technology that is being adopted in the construction of the dam, reiterating that the Federal Government had paid all claims of the land owners, including compensation for farmers over their crops and land.

Tags: 700MWFGNew RCC TechnologyZungeru Power Project
Simple Ikem

Simple Ikem

Recommended For You

FG Disbursed N316bn To National Assembly In Two Years As Spending Doubles

FG Disbursed N316bn To National Assembly In Two Years As Spending Doubles

The Federal Government has increased its financial disbursements to the National Assembly from ₦126.3 billion in 2022 to ₦316 billion in 2024, representing a 150 percent rise within...

COVID-19: Appeal Court Introduces Alternative e-payment For Filing Processes

Man Remanded For Impregnating 15-Year-old Girl In Lagos

A 23-year-old man, Victor Faleye, has been detained in custody at a correctional facility after his arraignment for allegedly defiling and impregnating a 15-year-old girl in Lagos. Faleye,...

Nigeria Ranks Seventh With International Students In US

US Court Jails Five Nigerians For 159 Years

A court in the United States has sentenced five Nigerian nationals to a combined 159 years in prison for their involvement in a sweeping $17 million fraud scheme...

OOU Faces Backlash Over ‘No Bra, No Entry’ During Examination

OOU Faces Backlash Over ‘No Bra, No Entry’ During Examination

A viral video showing female students of Olabisi Onabanjo University, Ago-Iwoye, being checked for bras before entering the examination hall has sparked widespread criticism online and on campus....

Next Post
Customer Service: More Than Just Quality Products

Customer Service: More Than Just Quality Products




Related News

General Assembly Approves UN’s $3.07bn Budget For 2020

General Assembly Approves UN’s $3.07bn Budget For 2020

Suicides: Okorocha Advocates Ministry of Happiness as Senate urges Ban of Sniper

Suicides: Okorocha Advocates Ministry of Happiness as Senate urges Ban of Sniper

FG Hails First Female Commodore, On Elevation, Retirement

FG Hails First Female Commodore, On Elevation, Retirement




The Next Edition

Office Address

3B, Agboola Aina street, Off Toyin Street,
Ikeja, Lagos.

Quick Contact Details

Phone:
08033018430
Whatsapp:
08051679910

Email:
[email protected]
[email protected]

Categories

  • Aviation
  • Beauty
  • Breaking News
  • Business
  • Columnists
  • Editorial
  • Entertainment
  • Fashion
  • Featured
  • Football
  • Foreign
  • Headline News
  • Home & Garden
  • Interviews
  • Investigations
  • North Central
  • North East
  • North West
  • Opinion
  • Parenting
  • Politics
  • Relationships
  • South East
  • South West
  • South-South
  • Special Reports
  • Sports
  • Top News
  • Vox Pops

© Next Edition Business Development Limited

  • About Us
  • Advert Rate
  • Contact Us
  • Privacy Policy
  • Terms of Use
No Result
View All Result
  • Home
  • About Us
  • News
  • Featured
  • Investigations
  • Foreign
  • Special Reports
  • Entertainment
  • Interviews
  • Advert Rate

© Next Edition Business Development Limited