The Next Edition
  • Home
  • About Us
  • News
  • Featured
  • Investigations
  • Foreign
  • Special Reports
  • Entertainment
  • Interviews
  • Advert Rate
No Result
View All Result
The Next Edition
No Result
View All Result
  • Home
  • About Us
  • News
  • Featured
  • Investigations
  • Foreign
  • Special Reports
  • Entertainment
  • Interviews
  • Advert Rate
Home Top News

FG to shutdown Third Mainland Bridge For Another 72 Hours Delicate Repairs From Friday

Next Edition by Next Edition
January 28, 2021
in Top News
FG to Reopen Third Mainland Bridge Midnight
0
SHARES
3
VIEWS
Share on FacebookShare on TwitterShare on Whatsapp

The Federal Controller of Works Lagos, Mr. Olukayode Popoola on wednesday announced another three days of total shutdown of the Third Mainland Bridge for another round of delicate expansion joints replacement.

Popoola told the News Agency of Nigeria (NAN) on telephone that the shutdown would take effect from midnight on Friday to midnight of Monday, Feb. 1.

You might also like

Outage: LASG To Restore Electricity To Badagry Communities 

Insecurity: FG Destroys 3,867 Illicit Weapons

Collapsed Pit Kills 11 Children In Kaduna

He explained that construction works had reached the stage for casting concrete on additional three expansion joints, hence the need to stop all movements on the bridge that could cause vibrations.

He said that the 72 hours closure was to ensure that the concrete sets properly during the curing process’ to make the rehabilitation works perfect and durable.

He appealed for the understanding of Lagos residents saying that, the Muhammadu Buhari administration was passionate about quality infrastructure delivery and safety of road users.

“Messers Boroni Prono is planning to cast three number expansion joints on Saturday 30th and Sunday 31st.

”This will require total closure of Third Mainland bridge from 12:00 midnight of Friday 29th till midnight of Monday 1st February 2021.

“We are sorry for the inconveniences this may cause Lagosians,”Popoola said.

The Third Mainland Bridge in Lagos, which is going through series of repairs, had to be partially shut on July 24 for another round of rehabilitation works.

READ ALSO: Benue Govt Raises Alarm Over Influx Of Herders, Impounds 376 Cows

The repair expected to last six months was extended by one month due to the recent #EndSARS protests in Lagos extending the completion date from January 2021 to February.

The construction was initially divided into two phases of three months on each carriageway, starting with the Oworonsoki bound carriageway whose completion dragged to four months.

Traffic was partially diverted on a stretch of 3.5km where construction is ongoing between Adeniji Adeniji Ramp and Ebute Meta, while different time belts were allotted for traffic diversions on the bridge.

The 11.8km bridge is the longest of the three bridges connecting Lagos Island to the Mainland.

The bridge starts from Oworonshoki, which is linked to the Apapa-Oshodi Expressway and the Lagos-Ibadan Expressway and ends at the Adeniji Adele Interchange on Lagos Island.

Constructed in 1990, the bridge was adjudged to be the longest in Africa until 1996 when the Oct. 6 Bridge in Cairo, Egypt was completed. (NAN)

 

Next Edition

Next Edition

Recommended For You

Eko Electricity Coy Promises Uninterrupted Power Supply During Eid-el-Fitr

Outage: LASG To Restore Electricity To Badagry Communities 

  The Lagos State Government has commenced efforts to restore electricity to communities in the Badagry-West Local Council Development Area (LCDA). Mr Bonu Solomon, the Lawmaker representing Badagry...

Alt="National Security Adviser (NSA), Malam Nuhu Ribadu"

Insecurity: FG Destroys 3,867 Illicit Weapons

The Federal Government has destroyed 3,867 Small and Light Weapons (SALW). The National Security Adviser (NSA), Malam Nuhu Ribadu, performed the destruction exercise at the Muhammadu Buhari Cantonment,...

Qatar To Build 500,000 Housing Units In Kaduna

Collapsed Pit Kills 11 Children In Kaduna

Eleven children were buried alive while excavating sand in northern Nigeria when a pit collapsed on Tuesday, police said. The children, aged between four and nine, were excavating...

Terrorists Targeting Nigeria, West African Coastline, US AFRICOM Warns

Terrorists Targeting Nigeria, West African Coastline, US AFRICOM Warns

The United States-led Africa Command has warned that terrorists are targeting the Nigerian and West African coastline to enhance their activities in the region. AFRICOM Commander, Gen Michael...

Next Post
Muhammad Takes Over As NBTE Acting Executive Secretary

Muhammad Takes Over As NBTE Acting Executive Secretary




Related News

Qatar 2022 Qualifiers: Super Eagles Draw With Cape Verde To Reach Final Round

Super Eagles Of Nigeria Earn $2.5 Million As They Arrive In Bouake

National Curfew: I-G Directs Personnel To Exempt Essential service Providers

National Curfew: I-G Directs Personnel To Exempt Essential service Providers

BREAKING: Jose Peseiro Officially Resigns As Super Eagles Coach

BREAKING: Jose Peseiro Officially Resigns As Super Eagles Coach




The Next Edition

Office Address

3B, Agboola Aina street, Off Toyin Street,
Ikeja, Lagos.

Quick Contact Details

Phone:
08033018430
Whatsapp:
08051679910

Email:
[email protected]
[email protected]

Categories

  • Aviation
  • Beauty
  • Breaking News
  • Business
  • Columnists
  • Editorial
  • Entertainment
  • Fashion
  • Featured
  • Football
  • Foreign
  • Headline News
  • Home & Garden
  • Interviews
  • Investigations
  • North Central
  • North East
  • North West
  • Opinion
  • Parenting
  • Politics
  • Relationships
  • South East
  • South West
  • South-South
  • Special Reports
  • Sports
  • Top News
  • Vox Pops

© Next Edition Business Development Limited

  • About Us
  • Advert Rate
  • Contact Us
  • Privacy Policy
  • Terms of Use
No Result
View All Result
  • Home
  • About Us
  • News
  • Featured
  • Investigations
  • Foreign
  • Special Reports
  • Entertainment
  • Interviews
  • Advert Rate

© Next Edition Business Development Limited