The Next Edition
  • Home
  • About Us
  • News
  • Featured
  • Investigations
  • Foreign
  • Special Reports
  • Entertainment
  • Interviews
  • Advert Rate
No Result
View All Result
The Next Edition
No Result
View All Result
  • Home
  • About Us
  • News
  • Featured
  • Investigations
  • Foreign
  • Special Reports
  • Entertainment
  • Interviews
  • Advert Rate
Home Top News

Amaechi Orders Stoppage Of Work On Lagos-Ibadan rail

Next Edition by Next Edition
December 21, 2019
in Top News
Nigeria Did not Mortgage Property for China Loan, Amaechi

Rotimi Amaechi

0
SHARES
1
VIEWS
Share on FacebookShare on TwitterShare on Whatsapp

The Minister of Transportation, Mr. Rotimi Amaechi, on Friday ordered stoppage of work at Omi-Adio Railway Station under construction on Lagos-Ibadan standard guage rail line over compromise of standards by the contractor.

Amaechi gave the directive when he got to the station during his monthly routine inspection tour of the ongoing project which he commenced from Lagos in company of others.

You might also like

Death Toll From Niger Flood Disaster Hits 115

EFCC Slams Fresh Corruption Charges On Ex-CBN Governor, Emefiele

Nigeria Rolls Out CNG Buses To Universities In Bid To Cut Transportation Costs

According to him, the observation of non-usage of stone for flooring at the station is one of the benefits of continuous inspection the project.

“One of the benefits of this inspection is what is happening here now. Now, the contractor has been seen to be doing very poor quality job in this station.

“We say stop and they have to start afresh.

“The implication is that if we didn’t stop here like we didn’t at Olodo (rail station), we won’t know what they are doing. If we didn’t stop here, they would have properly laid these things and proceeded.”

The minister said that he had directed the consultant to ensure that there would be a consulting staff, who is an engineer, in every station to ensure quality.

He said that the consultant must be on ground in each of the station always and not on visiting basis.

On progress in track laying, Amaechi said that the contractor had met the Federal Government’s target, but must work harder on construction of stations for speedy delivery.

READ ALSO: FG Closes Apapa Road For 72 hours Seeks Understanding For Construction Works

According to him, there is the need to speed up work on stations and deliver it by February which is the government timeline.

He said that the argument of contractor was to deliver by April 2020, but the government’s argument was that they needed more hands and equipment to complete on time.

Amaechi, who noted that the track laying had reached 156km, expressed worry about the pace of work at Agege axis and the extension to Apapa port.

“We need to speed up and be able to decongest Apapa. We cannot decongest Apapa if they don’t get there on time,” he said.

Amaechi said that the delay in completing the 10 minor and major railway stations along the rail line was becoming more embarrassing, especially in December.

He said that his next inspection in January would start from Ebute-Metta to Apapa to see the level of work there.

“No matter how fast we are to Ibadan, if we don’t link Ebute-Metta to the sea port, then it is useless. We really have to decongest the sea port,” Amaechi said.

On Ibadan-Kano standard guage rail line, the minister said that he was sure that the loan for the project would be signed between January and February 2020.

On the limited number of coaches for the free ride from Iju in Lagos and Moniya in Ibadan flagged of on Nov. 29 and commenced on Dec. 2, Amaechi urged the people to manage the two coaches till January.

“By January we will increase the number of coaches to about 12 to 13 to carry more passengers.”

The News Agency of Nigeria (NAN) reports that the track laying has moved from Iju Station to around Agege and that work was still ongoing in Lagos axis and in Ibadan axis.

It has reached 156 kilometres.

Amaechi, who assured Nigerians that the entire project would be delivered by April 2020, inspected Ebute-Metta, Agege, Agbado, Kajola, Papalanto, Abeokuta, Olodo, Omi Adio and Moniya stations on Friday.

NAN

Tags: Ebute MettafeaturedFederal Ministry of TransportationOmi-Adio Railway StationRotimi Amaechi
Next Edition

Next Edition

Recommended For You

Flood Takes Over Abeokuta Roads, As Ogun River Overflows

Death Toll From Niger Flood Disaster Hits 115

Flash floods that ripped through parts of Niger State have killed more than 100 people, an emergency services official said on Friday, with the toll expected to rise...

Court Freezes 65 Accounts For Forex Manipulation

EFCC Slams Fresh Corruption Charges On Ex-CBN Governor, Emefiele

The Economic and Financial Crimes Commission (EFCC) has filed fresh corruption charges against the former Governor of the Central Bank of Nigeria, Godwin Emefiele, accusing him of acquiring...

Nigeria Rolls Out CNG Buses To Universities In Bid To Cut Transportation Costs

Nigeria Rolls Out CNG Buses To Universities In Bid To Cut Transportation Costs

The Federal Government has begun deploying Compressed Natural Gas (CNG) powered buses to federal universities, starting with the University of Abuja. The initiative aims to cushion high transportation...

COVID-19: FG Mulls Alternatives on WAEC, Schools Re-opening

FG Launches Digital Village In Abuja To Boost Rural Connectivity

The Federal Ministry of Communications, Innovation and Digital Economy has unveiled a Digital Village in the Ibwa 2, Kura community of Gwagwalada Area Council, Abuja, as part of...

Next Post
Nigerian Woman Owoeye Jailed In UK Over £114K Benefits Fraud

Nigerian Woman Owoeye Jailed In UK Over £114K Benefits Fraud




Related News

Bayelsa House: Tension Rises As New Speaker Emerges

Bayelsa House: Tension Rises As New Speaker Emerges

SPECIAL REPORT: Hadiza Bala Usman’s Mission at the Ports

SPECIAL REPORT: Hadiza Bala Usman’s Mission at the Ports

‘I Failed In My Relationship, Almost Failed At Oxford University’ – DJ Cuppy Opens Up

May My Husband Seek God First Before Finding Me – Dj Cuppy




The Next Edition

Office Address

3B, Agboola Aina street, Off Toyin Street,
Ikeja, Lagos.

Quick Contact Details

Phone:
08033018430
Whatsapp:
08051679910

Email:
[email protected]
[email protected]

Categories

  • Aviation
  • Beauty
  • Breaking News
  • Business
  • Columnists
  • Editorial
  • Entertainment
  • Fashion
  • Featured
  • Football
  • Foreign
  • Headline News
  • Home & Garden
  • Interviews
  • Investigations
  • North Central
  • North East
  • North West
  • Opinion
  • Parenting
  • Politics
  • Relationships
  • South East
  • South West
  • South-South
  • Special Reports
  • Sports
  • Top News
  • Vox Pops

© Next Edition Business Development Limited

  • About Us
  • Advert Rate
  • Contact Us
  • Privacy Policy
  • Terms of Use
No Result
View All Result
  • Home
  • About Us
  • News
  • Featured
  • Investigations
  • Foreign
  • Special Reports
  • Entertainment
  • Interviews
  • Advert Rate

© Next Edition Business Development Limited